top of page

WINIFRED HOLTBY AND TWEENDYKES SCHOOL

  • Writer: Hull Flooring
    Hull Flooring
  • Sep 14
  • 2 min read

Updated: Sep 29

Phased flooring works across a dual-campus school, delivering safety, durability, and zero disruption.


Why this space matters

This joint secondary and special educational needs (SEN) school serves hundreds of students across a large shared campus. With a mix of mainstream classrooms, breakout zones, and SEN learning environments, every space needs to support calm, comfort, and control, especially for those with sensory needs. Floors must be safe, smooth, and durable under pressure – while being installed with zero disruption to the school day.


This is not just a floor...

It’s where focus, learning, and confidence can thrive.


Winifred and Tweendykes school, Hull

The brief

Hull Flooring was appointed to support a phased flooring replacement programme at Winifred Holtby & Tweendykes School. As part of a lifecycle maintenance agreement with the local authority, the facilities management company is tasked with keeping the building in top condition, including regular floor upgrades across all circulation, teaching, and support spaces.

 

We were brought in to uplift the existing flooring, prepare the subfloors, and install new safety vinyl and needlepunch carpet tiles throughout the school — working zone by zone across an estimated 3,000sqm footprint.


Making it work

All works are completed exclusively during school holidays, with clear and realistic goals agreed well in advance. Our planning and delivery needed to be exact – ensuring no overruns, no missed deadlines, and no disruption to the students or staff returning at the start of term.

 

We uplifted existing finishes, applied smoothing compound, and installed durable safety vinyl flooring in circulation areas and needlepunch carpet tiles in quieter zones. Working across multiple phases over time, our team ensured consistency, cleanliness, and compliance throughout – while responding flexibly to the priorities of the FM provider and school leadership.


The result

This ongoing programme continues to improve the quality, comfort, and safety of learning spaces across both schools. By working within the holiday windows and delivering to schedule, Hull Flooring supports an environment where students can thrive – without ever seeing the disruption behind the scenes.


Credit: Photography by Jack Gray Commercial & Lifestyle photographer


At a glance

  • Client: Winifred Holtby & Tweendykes School (via FM provider)

  • Sector: Education

  • Programme: Ongoing

  • Scope: Uplift, subfloor prep, and phased flooring replacement

  • Size: Approx. 3,000sqm

  • Timing: Holiday periods only

  • Key materials:

    • Smoothing compound

    • Safety vinyl flooring

    • Needlepunch carpet tiles


Outcome:

Zero disruption to teaching; upgraded learning environments delivered in line with lifecycle programme

Comments


Commenting on this post isn't available anymore. Contact the site owner for more info.
bottom of page