HALFORDS FLOORING REFURBISHMENT PROGRAMME
Hull Flooring has delivered flooring refurbishments across 26 Halfords stores since 2025, spanning England, Scotland, Wales, Northern Ireland and the Republic of Ireland. Each site needed 600 to 800 sqm stripped out and re-laid overnight, with stores handed back clean and trading-ready by morning. The rolling programme continues into 2026, with further stores scheduled. Every project has been completed on time and to specification, with zero disruption to trading.
2 min read


THE ENTERTAINER, KPOP TAKEOVER
Hull Flooring adapted part of The Entertainer’s Bullring flagship for a Netflix KPop Demon Hunters immersive experience in 2026, removing bespoke feature flooring and laying new material to bond seamlessly into the original. The team first delivered the store in 2020, tackling anhydrite subfloor challenges on a live construction site
2 min read


BODYCARE’S SHEFFIELD COMEBACK LAUNCHED
Bodycare's return to the high street started at The Moor in Sheffield, in a new store format with its own TikTok studio. Hull Flooring installed 450 m² of Karndean Opus luxury vinyl tiles in herringbone across the sales floor in seven days. Working with ARDEX's technical team, we prepared the existing ceramic tiles as the base for the new floor, so the old floor stayed where it was, saving the client time, cost and a skip full of waste.
3 min read


COMMERCIAL OFFICE FLOORING FOR BOLUDA TOWAGE, HEAD OFFICE HESSLE
When Boluda Towage's regional head office in Hessle was refurbished, we replaced the floors across both storeys, 520 square metres of carpet tile, LVT and safety vinyl. The design ran on curves rather than a straight grid, so our fitters set the lines out by hand with pegs and string before cutting a tile. We worked a floor at a time so the rest of the fit-out could keep moving.
3 min read


MERLIN ENTERTAINMENTS, ALTON TOWERS CBEEBIES HOTEL
Hull Flooring completed a 734sqm uplift and replacement of floor finishes at the CBeebies Hotel, Alton Towers. Delivered within a 15-day shutdown window, the project ensured a seamless reopening with no disruption to guests.
2 min read


WINIFRED HOLTBY AND TWEENDYKES SCHOOL
Hull Flooring is working across 3,000sqm of school space at Winifred Holtby & Tweendykes, replacing flooring in classrooms, corridors, and breakout areas. Installed during school holidays with zero disruption, the programme includes safety vinyl and carpet tile finishes,supporting student safety, comfort, and concentration in a dual-school setting.
2 min read


THE DEEP – HULL
Hull Flooring replaced 1,500sqm of vinyl flooring at The Deep in Hull – including walkways, viewing zones, and hospitality spaces. Working exclusively at night, our team delivered the full programme in 8 weeks with no disruption to visitors. A refreshed finish for a venue we’ve proudly partnered with for 25 years.
2 min read


THE ENTERTAINER, CAMBRIDGE
Hull Flooring completed subfloor prep and floor finishes at The Entertainer’s new store in Cambridge. By acting early and identifying additional prep requirements, the team avoided delays, maintained full site access for other trades, and delivered a safe, high-quality finish across 410sqm.
2 min read


HALFORDS RETAIL ROLLOUT
Hull Flooring completed a 15-site refurbishment programme for Halfords, replacing flooring across 600–800sqm per store during night shifts to avoid disruption. Over three months, our team delivered high-spec vinyl installs that met the client’s national brand standards - safely, efficiently, and to schedule.
2 min read


MKM STADIUM, THE CIRCLE RESTAURANT
Hull Flooring upgraded the hospitality experience at MKM Stadium’s Circle Restaurant, replacing carpet with modern herringbone LVT. Delivered in just one week during a planned shutdown, the result is a durable, easy-to-maintain finish ready for matchdays, private events, and everything in between.
2 min read


MERLIN ENTERTAINMENT – ALTON TOWERS, THEMED BEDROOMS
As part of a long-running programme for Merlin Entertainments, Hull Flooring refurbishes themed bedrooms at Alton Towers Resort. From Gangsta Granny to other beloved stories, our team installs custom carpets across 25–30sqm rooms without disrupting guests – helping to keep the magic alive beyond the park gates.
2 min read


OAKFIELD SCHOOL
Hull Flooring supported a 900sqm flooring programme at Oakfield School, working closely with the leadership team to choose colours and finishes suited to pupils with SEMH needs. All works were completed over a 4-week summer holiday window to avoid disruption, delivering a soft, safe and calming result.
2 min read